Why choose Solunar as your solar I&C contractor

Seven reasons developers and EPC companies trust us with installation and commissioning of their utility-scale solar power plants.

Seven reasons

Built to remove the risks that delay solar commissioning

Most solar project delays come from rework, missing machines and unreliable manpower. Here is how we are set up to avoid all three.

Solunar site worker in PPE curing solar piles
Reason 1

An in-house team, not a chain of subcontractors

Our 38-member team is on our own payroll: engineers, supervisors, a safety supervisor, surveyors, equipment operators and skilled site crew. The people who start your solar project are the people who finish it.

  • One team accountable for quality and schedule
  • No last-minute labour shortages from third-party contractors
  • Site crew trained on our own methods and checks
Tractor-mounted piling auger owned by Solunar
Reason 2

Our own equipment fleet

Hired machines are one of the biggest causes of delay on solar sites. We run our own equipment, so piling and civil work start as soon as the site is ready.

  • 3 tractors
  • 2 tractor-mounted piling augers
  • JCB backhoe loader for excavation and trenching
  • In-house survey team with survey equipment
String line and tape used for solar pile alignment
Reason 3

Accurate survey and layout, in-house

Every pile position decides how straight your module rows will be. Our own survey team marks the layout as per drawings and checks pile alignment before and after casting.

  • Layout marking as per approved drawings
  • Line and level checks on every row
  • Early correction before concrete is poured
Engineers walking a solar site during inspection
Reason 4

An inspection mindset from day one

Our founder has worked as a third-party quality inspector with TÜV NORD. We know what inspectors look for, so we build to pass inspection the first time and avoid costly rework.

  • Stage-wise quality checks before each handover
  • Test records kept for every stage
  • Quality systems set up by a founder trained in ISO 9001:2015 auditing
Toolbox safety talk with workers on a solar site
Reason 5

Safety on every site, every day

A safe site is a productive site. Safety is supervised daily, not checked once a month.

  • Dedicated safety supervisor at every site
  • Safety induction for every worker
  • Mandatory PPE for every worker
  • Daily toolbox safety talks before work starts
  • First-aid kit on every site
  • Barricading around open excavations
Tractors with piling augers and a backhoe loader mobilising to a solar site
Reason 6

Mobilised on site in 5 to 7 working days

Once the work order is final, our team and equipment are mobilised on site within 5 to 7 working days, anywhere in India. We have worked in Rajasthan, Gujarat, Karnataka, Madhya Pradesh and Maharashtra.

  • Pan-India mobilisation
  • Team and machines move together
  • Site office and material storage set up from day one
Solar piling site lit up for night work
Reason 7

Day and night work for on-time completion

Timely completion is our main aim. When the schedule demands it, our team works in day and night shifts, with lighting and supervision, so your commissioning date holds.

  • Day and night shifts when the schedule demands
  • Night work with proper site lighting and supervision
  • Daily progress tracked against the plan
How we execute

A clear process from work order to handover

Mobilisation, survey, piling, structure erection, module installation, cabling, testing and handover. Every stage is checked before the next one starts.

See our execution process

Planning a solar project?

Share your scope and timeline. We will come back with availability and a quote, or send you our company profile.

Have land?

Planning a solar plant on your agricultural land or for your business?

Solar for landowners
Solunar engineer

Got questions?

Our engineers are one WhatsApp message away.

Chat with our team

Get our company profile

Share a few details and our team will send the Solunar Infratech company profile to you.